The temporary Hockey Centre located in the Olympic Park will have two separate pitches with spectator seating, providing facilities suitable for Hockey during the Olympic Games and Paralympic Five-a-side and Seven-a-side Football.s a test
Sport:Hockey, Paralympic Five-a-side Football, Paralympic Seven-a side Football
Capacity: 15,000
New or existing?: New
The venue will be finished by 2011, in time for test events to take place before the 2012 Games.
During the Games
The main competition pitch will have a capacity of 15,000 and the second pitch will have seating of 5,000 to ensure that smaller matches also have an excellent atmosphere created by a capacity crowd.
After the Games
After the Games the Hockey Centre will move to the north of the Olympic Park, joining a group of facilities in the area known as Eton Manor. It will have 5,000 permanent seats with the ability to increase to over 10,000 for major events.